Operational Cost Data



Information Process Systems Services Environment Library Links Personnel Feedback

C-17 Feasibility Study Results

bulletComparison Based on Kelly AFB Facility
bulletActual C-5 PMB Cost and Cycle Time Adjusted for C-17 Moldline
bullet120 Unit C-17 Fleet - Each Aircraft Depainted Twice (240 Net) in 20 Years
bullet1997 Economics (Not Discounted)
 
Item FLASHJET
per C-17
PMB
per C-17
FLASHJET
Total LCC
PMB
Total LCC
Total Cost $78,288 $307,100 $24.64M 73.70M
Depaint Cost
per ft2
$3.52 $13.81 n/a n/a
Labor Hours 516 3,374 123,840 809,760
Material Costs $14,213 $22,032 $3.41M $5.29M
HAZMAT Disposal Costs $673 $6,835 $0.16M $1.64M
HAZMAT Volume 112 Lbs 1,092 Lbs 26,880 Lbs 262,080 Lbs
Total Depaint Time 125 Hrs. (2 units) 159 Hrs. 30,000 Hrs. 38,160 Hrs.

Paint Strip Process Comparison

Item FLASHJET Dry Media
Wheat Starch
Chemical
Operating Cost Low High High
Strip Rate Medium Medium High1
Pre-Strip/
Post-Strip Effort
Low High High
Strip Effort Low High High
Hazardous Waste Low High High

1 Methylene Chloride; Low for non-Hap (Hazardous Air Pollutant) Chemicals

FLASHJET Process Vs. Blast Media

Five Year Life Cycle Cost Comparison


 